SPC Jackson G (17INR0003)
SPC Jackson G is a 916.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at New sub tapping both Elm Creek (5133) - STP (5915) 345kV lines, about 92 miles E of Elm Creek.
916.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology
Project facts
| Canonical name | SPC Jackson G |
|---|---|
| Queue ID | 17INR0003 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Gas |
| Capacity | 916.0 MW |
| State | — |
| County | — |
| Point of interconnection | New sub tapping both Elm Creek (5133) - STP (5915) 345kV lines, about 92 miles E of Elm Creek |
| Requested (queue) date | 2013-01-02 |
| Proposed in-service date | 2018-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Southern California Solar DBA Solar Electrical Systems |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata