Spearman Interchange 115 kV Substation (GEN-2023-124)

Spearman Interchange 115 kV Substation is a 200.0 MW wind interconnection project in Ochiltree/Handsford, Texas with a current status of withdrawn. It is proposed to connect at Spearman Interchange 115 kV Substation.

200.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameSpearman Interchange 115 kV Substation
Queue IDGEN-2023-124
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity200.0 MW
StateTexas
CountyOchiltree/Handsford
Point of interconnectionSpearman Interchange 115 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2030-12-31
Operational date
Withdrawn date2024-03-22
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata