Ochiltree/Handsford County, Texas — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Ochiltree/Handsford, Texas, representing 735 MW of requested capacity.
3Total projects
0Active
0Operational
3Withdrawn
735 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 735 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Pringle Interchange 230 kV Substation | GEN-2023-123 | Wind | 285.0 MW | withdrawn | Ochiltree/Handsford, Texas |
| Hutchinson 230 kV Substation | GEN-2023-125 | Wind | 250.0 MW | withdrawn | Ochiltree/Handsford, Texas |
| Spearman Interchange 115 kV Substation | GEN-2023-124 | Wind | 200.0 MW | withdrawn | Ochiltree/Handsford, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Ochiltree/Handsford County.
Start tracking with interXdata