Springer Storage (C24-256)
Springer Storage is a 79.9 MW battery interconnection project in Washington, New York with a current status of withdrawn. It is proposed to connect at Mohican-Whitehall Line 13 115kV.
79.9 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology
Project facts
| Canonical name | Springer Storage |
|---|---|
| Queue ID | C24-256 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | NYISO |
| Technology | Battery |
| Capacity | 79.9 MW |
| State | New York |
| County | Washington |
| Point of interconnection | Mohican-Whitehall Line 13 115kV |
| Requested (queue) date | 2024-09-23 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Springer Storage |
| Utility / transmission owner | NM-NG |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata