Springs 230kV (GEN-2016-054)

Springs 230kV is a 3.4 MW wind interconnection project in Jerauld, South Dakota with a current status of withdrawn. It is proposed to connect at Springs 230kV.

3.4 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameSprings 230kV
Queue IDGEN-2016-054
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity3.4 MW
StateSouth Dakota
CountyJerauld
Point of interconnectionSprings 230kV
Requested (queue) date2016-03-28
Proposed in-service date
Operational date
Withdrawn date2019-05-23
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.