Spurland Solar I (29INR0192)

Spurland Solar I is a 302.1 MW solar interconnection project in Dickens, Texas with a current status of operational. It is proposed to connect at 59908 Nova Prime 345 345kV .

302.1 MWCapacity
OperationalStatus
DickensMarket
SolarTechnology

Project facts

Canonical nameSpurland Solar I
Queue ID29INR0192
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDickens
TechnologySolar
Capacity302.1 MW
StateTexas
CountyDickens
Point of interconnection59908 Nova Prime 345 345kV
Requested (queue) date2025-11-05
Proposed in-service date
Operational date2028-12-30
Withdrawn date
DeveloperSpurland Solar II
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata