SR Arlington I (GI-129)

SR Arlington I is a 20.0 MW solar interconnection project in Early, Georgia with a current status of operational. It is proposed to connect at Giles 115 kV Substation.

20.0 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSR Arlington I
Queue IDGI-129
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity20.0 MW
StateGeorgia
CountyEarly
Point of interconnectionGiles 115 kV Substation
Requested (queue) date2023-12-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata