Early County, Georgia — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Early, Georgia, representing 393 MW of requested capacity.
7Total projects
0Active
7Operational
0Withdrawn
393 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 7 | 393 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SR Arlington II | GI-108 | Solar | 109.0 MW | operational | Early, Georgia |
| SR Arlington II | 62367_ARLII | Solar | 102.5 MW | operational | Early, Georgia |
| SR Cedar Springs, LLC | 64840_SRCS | Solar | 70.0 MW | operational | Early, Georgia |
| SR Cedar Springs | GI-111 | Solar | 70.0 MW | operational | Early, Georgia |
| SR Arlington I | 62436_ARLI | Solar | 20.0 MW | operational | Early, Georgia |
| SR Arlington I | GI-129 | Solar | 20.0 MW | operational | Early, Georgia |
| Georgia Power at Jakin GA PV | 61397_PV1 | Solar | 1.5 MW | operational | Early, Georgia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Early County.
Start tracking with interXdata