Early County, Georgia — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Early, Georgia, representing 393 MW of requested capacity.

7Total projects
0Active
7Operational
0Withdrawn
393 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar7393 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
SR Arlington IIGI-108Solar109.0 MWoperationalEarly, Georgia
SR Arlington II62367_ARLIISolar102.5 MWoperationalEarly, Georgia
SR Cedar Springs, LLC64840_SRCSSolar70.0 MWoperationalEarly, Georgia
SR Cedar SpringsGI-111Solar70.0 MWoperationalEarly, Georgia
SR Arlington I62436_ARLISolar20.0 MWoperationalEarly, Georgia
SR Arlington IGI-129Solar20.0 MWoperationalEarly, Georgia
Georgia Power at Jakin GA PV61397_PV1Solar1.5 MWoperationalEarly, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Early County.

Start tracking with interXdata