Staccato BESS (25INR0189)

Staccato BESS is a 201.8 MW other interconnection project in Fayette, Texas with a current status of operational. It is proposed to connect at 138kV WARDA #7312. .

201.8 MWCapacity
OperationalStatus
FayetteMarket
OtherTechnology

Project facts

Canonical nameStaccato BESS
Queue ID25INR0189
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketFayette
TechnologyOther
Capacity201.8 MW
StateTexas
CountyFayette
Point of interconnection138kV WARDA #7312.
Requested (queue) date2022-11-07
Proposed in-service date—
Operational date2027-05-28
Withdrawn date—
DeveloperStaccato Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30operational_date2027-02-242027-05-28medium
2026-08-31operational_date2026-12-312027-02-24medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata