Stegall 230 kV substation (GEN-2022-061)

Stegall 230 kV substation is a 180.0 MW solar interconnection project in Scotts Bluff, Nebraska with a current status of withdrawn. It is proposed to connect at Stegall 230 kV substation.

180.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameStegall 230 kV substation
Queue IDGEN-2022-061
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity180.0 MW
StateNebraska
CountyScotts Bluff
Point of interconnectionStegall 230 kV substation
Requested (queue) date2022-07-18
Proposed in-service date2028-06-08
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata