Stegall 230kV Substation (GEN-2018-036)

Stegall 230kV Substation is a 200.0 MW battery interconnection project in Scotts Bluff, Nebraska with a current status of withdrawn. It is proposed to connect at Stegall 230kV Substation.

200.0 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameStegall 230kV Substation
Queue IDGEN-2018-036
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity200.0 MW
StateNebraska
CountyScotts Bluff
Point of interconnectionStegall 230kV Substation
Requested (queue) date2018-05-29
Proposed in-service date2023-10-15
Operational date
Withdrawn date2022-08-23
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.