Stegall Solar (25INR0497)

Stegall Solar is a 81.6 MW solar interconnection project in Robertson, Texas with a current status of operational. It is proposed to connect at Elliott (Bus #53) to Franklin (Bus #57) 69kV Transmission Line.

81.6 MWCapacity
OperationalStatus
RobertsonMarket
SolarTechnology

Project facts

Canonical nameStegall Solar
Queue ID25INR0497
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketRobertson
TechnologySolar
Capacity81.6 MW
StateTexas
CountyRobertson
Point of interconnectionElliott (Bus #53) to Franklin (Bus #57) 69kV Transmission Line
Requested (queue) date2023-08-21
Proposed in-service date
Operational date2027-05-30
Withdrawn date
DeveloperBT Martin Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.