Stegall Storage (25INR0498)

Stegall Storage is a 50.5 MW other interconnection project in Robertson, Texas with a current status of operational. It is proposed to connect at Tap connection to a new switching station on the Elliott (Bus #53) - Franklin (Bus #57) 69 kV Transmission Line .

50.5 MWCapacity
OperationalStatus
RobertsonMarket
OtherTechnology

Project facts

Canonical nameStegall Storage
Queue ID25INR0498
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketRobertson
TechnologyOther
Capacity50.5 MW
StateTexas
CountyRobertson
Point of interconnectionTap connection to a new switching station on the Elliott (Bus #53) - Franklin (Bus #57) 69 kV Transmission Line
Requested (queue) date2023-08-21
Proposed in-service date
Operational date2027-05-30
Withdrawn date
DeveloperBT Martin Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata