Stemple 345kV (AC2-016)

Stemple 345kV is a 6.0 MW gas interconnection project in Carroll, Ohio with a current status of operational.

6.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameStemple 345kV
Queue IDAC2-016
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity6.0 MW
StateOhio
CountyCarroll
Point of interconnection
Requested (queue) date2017-01-03
Proposed in-service date
Operational date2019-09-01
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata