Stockyard Grid Batt II (23INR0417)

Stockyard Grid Batt II is a 49.2 MW other interconnection project in Tarrant, Texas with a current status of withdrawn. It is proposed to connect at 138 kV Hicks Switch (Bus# 2082).

49.2 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameStockyard Grid Batt II
Queue ID23INR0417
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity49.2 MW
StateTexas
CountyTarrant
Point of interconnection138 kV Hicks Switch (Bus# 2082)
Requested (queue) date
Proposed in-service date2023-06-01
Operational date
Withdrawn date2021-11-19
DeveloperStockyard Grid, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata