Stockyard Grid Batt II (23INR0417)
Stockyard Grid Batt II is a 49.2 MW other interconnection project in Tarrant, Texas with a current status of withdrawn. It is proposed to connect at 138 kV Hicks Switch (Bus# 2082).
49.2 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Stockyard Grid Batt II |
|---|---|
| Queue ID | 23INR0417 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Other |
| Capacity | 49.2 MW |
| State | Texas |
| County | Tarrant |
| Point of interconnection | 138 kV Hicks Switch (Bus# 2082) |
| Requested (queue) date | — |
| Proposed in-service date | 2023-06-01 |
| Operational date | — |
| Withdrawn date | 2021-11-19 |
| Developer | Stockyard Grid, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata