Stuarts Draft-Waynesboro 115kV (AC2-112)

Stuarts Draft-Waynesboro 115kV is a 150.0 MW solar interconnection project in Augusta, Virginia with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameStuarts Draft-Waynesboro 115kV
Queue IDAC2-112
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateVirginia
CountyAugusta
Point of interconnection
Requested (queue) date2017-03-17
Proposed in-service date2023-12-15
Operational date
Withdrawn date2024-09-27
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata