Summer Shade-Green County 161 kV (AG2-094 - moved to TC2)

Summer Shade-Green County 161 kV is a 150.0 MW solar interconnection project in Metcalfe, Kentucky with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameSummer Shade-Green County 161 kV
Queue IDAG2-094 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity150.0 MW
StateKentucky
CountyMetcalfe
Point of interconnection—
Requested (queue) date2021-01-27
Proposed in-service date2024-04-01
Operational date—
Withdrawn date2025-05-05
Developer—
Utility / transmission ownerEKPC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata