Summit 115kV Substation (GEN-2018-007)

Summit 115kV Substation is a 150.0 MW solar interconnection project in Grant/Roberts, South Dakota with a current status of withdrawn. It is proposed to connect at Summit 115kV Substation.

150.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameSummit 115kV Substation
Queue IDGEN-2018-007
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity150.0 MW
StateSouth Dakota
CountyGrant/Roberts
Point of interconnectionSummit 115kV Substation
Requested (queue) date2018-04-27
Proposed in-service date2025-10-31
Operational date
Withdrawn date2023-04-06
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata