SunRay (21INR0395)

SunRay is a 203.5 MW solar interconnection project in Uvalde, Texas with a current status of operational. It is proposed to connect at Dry Frio 138 kV station.

203.5 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSunRay
Queue ID21INR0395
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity203.5 MW
StateTexas
CountyUvalde
Point of interconnectionDry Frio 138 kV station
Requested (queue) date2019-07-16
Proposed in-service date2024-08-20
Operational date2024-08-20
Withdrawn date
DeveloperAP Sunray LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata