SunSelect1 (61754_2)

SunSelect1 is a 3.3 MW gas interconnection project in Kern, California with a current status of operational.

3.3 MWCapacity
OperationalStatus
CISOMarket
GasTechnology

Project facts

Canonical nameSunSelect1
Queue ID61754_2
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyGas
Capacity3.3 MW
StateCalifornia
CountyKern
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-06-01
Withdrawn date
Developer
Utility / transmission ownerSunSelect Produce (California) Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata