Surry - Hopewell 230 kV (AH1-090)

Surry - Hopewell 230 kV is a 80.0 MW solar interconnection project in Surry, Virginia with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSurry - Hopewell 230 kV
Queue IDAH1-090
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity80.0 MW
StateVirginia
CountySurry
Point of interconnection
Requested (queue) date2021-07-30
Proposed in-service date2024-11-15
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.