Surry-Skiffes Creek 500kV (AH1-726 - moved to TC2)
Surry-Skiffes Creek 500kV is a 600.0 MW battery interconnection project in James City, Virginia with a current status of withdrawn.
600.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Surry-Skiffes Creek 500kV |
|---|---|
| Queue ID | AH1-726 - moved to TC2 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 600.0 MW |
| State | Virginia |
| County | James City |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2029-06-11 |
| Operational date | — |
| Withdrawn date | 2025-07-03 |
| Developer | — |
| Utility / transmission owner | Dominion |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata