Swamp 230 kV (AF1-152 - moved to TC1)

Swamp 230 kV is a 50.0 MW solar interconnection project in Pasquotank, North Carolina with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSwamp 230 kV
Queue IDAF1-152 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateNorth Carolina
CountyPasquotank
Point of interconnection
Requested (queue) date2019-09-19
Proposed in-service date2023-10-02
Operational date
Withdrawn date2025-01-22
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.