System Control Center (61742_GEN1)

System Control Center is a 2.5 MW other interconnection project in Travis, Texas with a current status of operational.

2.5 MWCapacity
OperationalStatus
ERCOMarket
OtherTechnology

Project facts

Canonical nameSystem Control Center
Queue ID61742_GEN1
Statusoperational
Source status(SB) Standby/Backup: available for service but not normally used
MarketERCO
TechnologyOther
Capacity2.5 MW
StateTexas
CountyTravis
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2012-06-01
Withdrawn date—
Developer—
Utility / transmission ownerAustin Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata