Austin Energy — Interconnection Queue Projects
Austin Energy is associated with 18 tracked interconnection projects representing 1,029 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 13 | 907 MW |
| Other | 4 | 120 MW |
| Battery | 1 | 2 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 18 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sand Hill | 7900_5A | Gas | 198.0 MW | operational | Travis, Texas |
| Sand Hill | 7900_5C | Gas | 190.0 MW | operational | Travis, Texas |
| Nacogdoches Power | 55708_STG4 | Other | 114.0 MW | operational | Nacogdoches, Texas |
| Decker Creek | 3548_GT1 | Gas | 51.5 MW | operational | Travis, Texas |
| Decker Creek | 3548_GT4 | Gas | 51.5 MW | operational | Travis, Texas |
| Decker Creek | 3548_GT2 | Gas | 51.5 MW | operational | Travis, Texas |
| Decker Creek | 3548_GT3 | Gas | 51.5 MW | operational | Travis, Texas |
| Sand Hill | 7900_SH1 | Gas | 51.4 MW | operational | Travis, Texas |
| Sand Hill | 7900_SH2 | Gas | 51.4 MW | operational | Travis, Texas |
| Sand Hill | 7900_SH6 | Gas | 51.4 MW | operational | Travis, Texas |
| Sand Hill | 7900_SH4 | Gas | 51.4 MW | operational | Travis, Texas |
| Sand Hill | 7900_SH7 | Gas | 51.4 MW | operational | Travis, Texas |
| Sand Hill | 7900_SH3 | Gas | 51.4 MW | operational | Travis, Texas |
| Robert Mueller Energy Center | 56374_CT1 | Gas | 4.6 MW | operational | Travis, Texas |
| System Control Center | 61742_GEN2 | Other | 2.5 MW | operational | Travis, Texas |
| System Control Center | 61742_GEN1 | Other | 2.5 MW | operational | Travis, Texas |
| Robert Mueller Energy Center | 56374_DG1 | Other | 1.5 MW | operational | Travis, Texas |
| Kingsberry Energy Storage System | 61741_KBESS | Battery | 1.5 MW | operational | Travis, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.