Tall Saddle Solar (27INR0309)

Tall Saddle Solar is a 252.3 MW solar interconnection project in Kenedy, Texas with a current status of operational. It is proposed to connect at 80076 AJO SUBSTATION 345kV.

252.3 MWCapacity
OperationalStatus
KenedyMarket
SolarTechnology

Project facts

Canonical nameTall Saddle Solar
Queue ID27INR0309
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketKenedy
TechnologySolar
Capacity252.3 MW
StateTexas
CountyKenedy
Point of interconnection80076 AJO SUBSTATION 345kV
Requested (queue) date2024-07-01
Proposed in-service date
Operational date2029-10-15
Withdrawn date
DeveloperTall Saddle Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata