Tap 115kV Maurine to Newell transmission line (GEN-2019-017)

Tap 115kV Maurine to Newell transmission line is a 142.8 MW wind interconnection project in Butte, South Dakota with a current status of withdrawn. It is proposed to connect at Tap 115kV Maurine to Newell transmission line.

142.8 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameTap 115kV Maurine to Newell transmission line
Queue IDGEN-2019-017
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity142.8 MW
StateSouth Dakota
CountyButte
Point of interconnectionTap 115kV Maurine to Newell transmission line
Requested (queue) date2019-04-24
Proposed in-service date2025-04-01
Operational date
Withdrawn date2022-11-16
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata