Tap Pauline - Hildreth 115kV (GEN-2013-015)

Tap Pauline - Hildreth 115kV is a 125.8 MW wind interconnection project in Webster, Nebraska with a current status of withdrawn. It is proposed to connect at Tap Pauline - Hildreth 115kV.

125.8 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameTap Pauline - Hildreth 115kV
Queue IDGEN-2013-015
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity125.8 MW
StateNebraska
CountyWebster
Point of interconnectionTap Pauline - Hildreth 115kV
Requested (queue) date2013-03-29
Proposed in-service date
Operational date
Withdrawn date2014-08-13
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata