Tap Pauline - Hildreth (Rosemont) 115kV (GEN-2008-123N)
Tap Pauline - Hildreth (Rosemont) 115kV is a 89.7 MW wind interconnection project in Webster County, Nebraska with a current status of operational. It is proposed to connect at Tap Pauline - Hildreth (Rosemont) 115kV.
89.7 MWCapacity
OperationalStatus
NEMarket
WindTechnology
Project facts
| Canonical name | Tap Pauline - Hildreth (Rosemont) 115kV |
|---|---|
| Queue ID | GEN-2008-123N |
| Status | operational |
| Source status | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| Market | NE |
| Technology | Wind |
| Capacity | 89.7 MW |
| State | Nebraska |
| County | Webster County |
| Point of interconnection | Tap Pauline - Hildreth (Rosemont) 115kV |
| Requested (queue) date | 2008-11-12 |
| Proposed in-service date | — |
| Operational date | 2016-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NPPD |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.