Tap Pierre - Midland 115 kV line (GEN-2023-066)
Tap Pierre - Midland 115 kV line is a 130.0 MW solar interconnection project in Stanley, South Dakota with a current status of withdrawn. It is proposed to connect at Tap Pierre - Midland 115 kV line.
130.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology
Project facts
| Canonical name | Tap Pierre - Midland 115 kV line |
|---|---|
| Queue ID | GEN-2023-066 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | SD |
| Technology | Solar |
| Capacity | 130.0 MW |
| State | South Dakota |
| County | Stanley |
| Point of interconnection | Tap Pierre - Midland 115 kV line |
| Requested (queue) date | 2023-10-02 |
| Proposed in-service date | 2028-11-01 |
| Operational date | — |
| Withdrawn date | 2024-03-22 |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata