Tap S974 - Hydrocarbon Tap 69kV (GEN-2013-018)

Tap S974 - Hydrocarbon Tap 69kV is a 51.0 MW wind interconnection project in Otoe, Nebraska with a current status of withdrawn. It is proposed to connect at Tap S974 - Hydrocarbon Tap 69kV.

51.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameTap S974 - Hydrocarbon Tap 69kV
Queue IDGEN-2013-018
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity51.0 MW
StateNebraska
CountyOtoe
Point of interconnectionTap S974 - Hydrocarbon Tap 69kV
Requested (queue) date2013-04-02
Proposed in-service date
Operational date
Withdrawn date2013-10-02
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.