Otoe County, Nebraska — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in Otoe, Nebraska, representing 1,734 MW of requested capacity.
16Total projects
0Active
14Operational
2Withdrawn
1,734 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 4 | 1,396 MW |
| Solar | 1 | 250 MW |
| Wind | 1 | 51 MW |
| Gas | 10 | 38 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Nebraska City | 6096_2 | Other | 738.0 MW | operational | Otoe, Nebraska |
| Nebraska City | 6096_1 | Other | 651.6 MW | operational | Otoe, Nebraska |
| Cass County to Nebraska City #2 345kV | GEN-2020-004 | Solar | 250.0 MW | withdrawn | Otoe, Nebraska |
| Tap S974 - Hydrocarbon Tap 69kV | GEN-2013-018 | Wind | 51.0 MW | withdrawn | Otoe, Nebraska |
| Nebraska City # 1 | 2255_10 | Gas | 6.5 MW | operational | Otoe, Nebraska |
| Nebraska City # 1 | 2255_9 | Gas | 6.4 MW | operational | Otoe, Nebraska |
| Nebraska City # 2 | 7555_12 | Gas | 4.5 MW | operational | Otoe, Nebraska |
| Nebraska City # 2 | 7555_11 | Gas | 4.5 MW | operational | Otoe, Nebraska |
| Nebraska City # 2 | 7555_13 | Other | 4.5 MW | operational | Otoe, Nebraska |
| Nebraska City # 1 | 2255_8 | Gas | 4.1 MW | operational | Otoe, Nebraska |
| Nebraska City # 1 | 2255_4 | Gas | 3.1 MW | operational | Otoe, Nebraska |
| Nebraska City # 1 | 2255_3 | Gas | 2.5 MW | operational | Otoe, Nebraska |
| Syracuse # 2 | 2256_6 | Gas | 2.0 MW | operational | Otoe, Nebraska |
| Syracuse # 2 | 2256_7 | Gas | 2.0 MW | operational | Otoe, Nebraska |
| Nebraska City # 1 | 2255_5 | Gas | 2.0 MW | operational | Otoe, Nebraska |
| Nebraska City # 1 | 2255_2 | Other | 1.5 MW | operational | Otoe, Nebraska |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.