Taping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li (J3116)

Taping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li is a 200.0 MW solar interconnection project in Phillips, Arkansas with a current status of withdrawn. It is proposed to connect at Taping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTaping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li
Queue IDJ3116
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateArkansas
CountyPhillips
Point of interconnectionTaping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li
Requested (queue) date2022-09-15
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.