Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345 (J3119)
Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345 is a 350.0 MW solar interconnection project in Pulaski, Indiana with a current status of withdrawn. It is proposed to connect at Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345.
Project facts
| Canonical name | Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345 |
|---|---|
| Queue ID | J3119 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 350.0 MW |
| State | Indiana |
| County | Pulaski |
| Point of interconnection | Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345 |
| Requested (queue) date | 2022-09-15 |
| Proposed in-service date | 2026-06-30 |
| Operational date | 2026-06-30 |
| Withdrawn date | 2022-12-06 |
| Developer | — |
| Utility / transmission owner | NORTHERN INDIANA PUBLIC SERVICE COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.