Target Woodland Solar Project (62246_TWSP)

Target Woodland Solar Project is a 2.3 MW solar interconnection project in Yolo, California with a current status of operational.

2.3 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameTarget Woodland Solar Project
Queue ID62246_TWSP
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity2.3 MW
StateCalifornia
CountyYolo
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-12-01
Withdrawn date—
Developer—
Utility / transmission ownerMN8 Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata