Tasley-Kellam 69kV (Y1-008)

Tasley-Kellam 69kV is a 50.0 MW wind interconnection project in Accomack, Virginia with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameTasley-Kellam 69kV
Queue IDY1-008
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity50.0 MW
StateVirginia
CountyAccomack
Point of interconnection—
Requested (queue) date2012-02-17
Proposed in-service date2014-12-31
Operational date—
Withdrawn date2013-03-26
Developer—
Utility / transmission ownerODEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata