TE Smith Storage 2 (26INR0418)

TE Smith Storage 2 is a 125.3 MW other interconnection project in Rockwall, Texas with a current status of operational. It is proposed to connect at 2478 Royse 345kV.

125.3 MWCapacity
OperationalStatus
RockwallMarket
OtherTechnology

Project facts

Canonical nameTE Smith Storage 2
Queue ID26INR0418
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRockwall
TechnologyOther
Capacity125.3 MW
StateTexas
CountyRockwall
Point of interconnection2478 Royse 345kV
Requested (queue) date2024-04-15
Proposed in-service date
Operational date2027-08-16
Withdrawn date
DeveloperSmith II Battery Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.