Rockwall County, Texas — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Rockwall, Texas, representing 790 MW of requested capacity.
4Total projects
1Active
2Operational
1Withdrawn
790 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 539 MW |
| Battery | 2 | 250 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| BRP Rhea BESS | 24INR0129 | Other | 414.1 MW | withdrawn | Rockwall, Texas |
| TE Smith Storage | 22INR0555 | Battery | 125.4 MW | active | Rockwall, Texas |
| TE Smith Storage 2 | 26INR0418 | Other | 125.3 MW | operational | Rockwall, Texas |
| TE Smith Storage | 69329_SMITH | Battery | 125.0 MW | operational | Rockwall, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| BRP Rhea BESS LLC | 1 | 414 MW |
| Smith II Battery Storage, LLC | 1 | 125 MW |
| BT Smith Storage, LLC | 1 | 125 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Rockwall County.
Start tracking with interXdata