TECO GTG2 (23INR0408)

TECO GTG2 is a 50.0 MW gas interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at 47430 TECO 138 kV.

50.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameTECO GTG2
Queue ID23INR0408
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity50.0 MW
StateTexas
CountyHarris
Point of interconnection47430 TECO 138 kV
Requested (queue) date2021-11-03
Proposed in-service date2024-10-15
Operational date2024-04-17
Withdrawn date
DeveloperThermal Energy Corporation
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata