Tehuacana Creek BESS-Alt POI (24INR0434)

Tehuacana Creek BESS-Alt POI is a 356.0 MW other interconnection project in Freestone, Texas with a current status of withdrawn. It is proposed to connect at Tap 345kV 46020 Limestone – 68091 Navarro.

356.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameTehuacana Creek BESS-Alt POI
Queue ID24INR0434
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity356.0 MW
StateTexas
CountyFreestone
Point of interconnectionTap 345kV 46020 Limestone – 68091 Navarro
Requested (queue) date2022-10-05
Proposed in-service date2025-05-31
Operational date
Withdrawn date2022-11-30
DeveloperTehuacana Creek Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.