Tekamah 161 kV Substation (GEN-2022-153)

Tekamah 161 kV Substation is a 100.0 MW battery interconnection project in Burt, Nebraska with a current status of withdrawn. It is proposed to connect at Tekamah 161 kV Substation.

100.0 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameTekamah 161 kV Substation
Queue IDGEN-2022-153
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity100.0 MW
StateNebraska
CountyBurt
Point of interconnectionTekamah 161 kV Substation
Requested (queue) date2023-02-24
Proposed in-service date2026-08-21
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata