Telogia Biomass (027096)

Telogia Biomass is a 14.0 MW other interconnection project in Liberty, Florida with a current status of withdrawn. It is proposed to connect at Liberty Substation.

14.0 MWCapacity
WithdrawnStatus
FLMarket
OtherTechnology

Project facts

Canonical nameTelogia Biomass
Queue ID027096
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyOther
Capacity14.0 MW
StateFlorida
CountyLiberty
Point of interconnectionLiberty Substation
Requested (queue) date2009-02-10
Proposed in-service date2009-06-01
Operational date
Withdrawn date
DeveloperTelogia Biomass
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.