Liberty County, Florida — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Liberty, Florida, representing 253 MW of requested capacity.
5Total projects
2Active
0Operational
3Withdrawn
253 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 225 MW |
| Other | 2 | 28 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| North Duke Energy Florida, LLC20 | FC100383 | Solar | 74.9 MW | active | Liberty, Florida |
| Duke Energy Florida, LLC | 229900 | Solar | 74.9 MW | withdrawn | Liberty, Florida |
| North Duke Energy Florida, LLC20 | FC100018 | Solar | 74.9 MW | active | Liberty, Florida |
| Telogia Biomass | 027096 | Other | 14.0 MW | withdrawn | Liberty, Florida |
| Southeast Queue Project 98 — Other in Liberty, Florida | 98 | Other | 14.0 MW | withdrawn | Liberty, Florida |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| North Duke Energy Florida, LLC20 | 2 | 150 MW |
| Telogia Biomass | 2 | 28 MW |
| Duke Energy Florida, LLC | 1 | 75 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: duke-def-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Liberty County.
Start tracking with interXdata