Tenaska Switching Substation 345kV (GEN-2020-081)

Tenaska Switching Substation 345kV is a 200.0 MW battery interconnection project in Rusk, Texas with a current status of active. It is proposed to connect at Tenaska Switching Substation 345kV.

200.0 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameTenaska Switching Substation 345kV
Queue IDGEN-2020-081
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketTX
TechnologyBattery
Capacity200.0 MW
StateTexas
CountyRusk
Point of interconnectionTenaska Switching Substation 345kV
Requested (queue) date2020-04-30
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata