Texas Cotton Solar (26INR0568)

Texas Cotton Solar is a 201.6 MW solar interconnection project in Brazos, Texas with a current status of active. It is proposed to connect at Tap 345kV 975 Jack_Creek - 967 Gibbons Creek.

201.6 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameTexas Cotton Solar
Queue ID26INR0568
Statusactive
Source statusactive
MarketERCOT
TechnologySolar
Capacity201.6 MW
StateTexas
CountyBrazos
Point of interconnectionTap 345kV 975 Jack_Creek - 967 Gibbons Creek
Requested (queue) date2024-10-01
Proposed in-service date2028-12-31
Operational date
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata