Texas Cotton Solar (26INR0568)
Texas Cotton Solar is a 201.6 MW solar interconnection project in Brazos, Texas with a current status of active. It is proposed to connect at Tap 345kV 975 Jack_Creek - 967 Gibbons Creek.
201.6 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | Texas Cotton Solar |
|---|---|
| Queue ID | 26INR0568 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 201.6 MW |
| State | Texas |
| County | Brazos |
| Point of interconnection | Tap 345kV 975 Jack_Creek - 967 Gibbons Creek |
| Requested (queue) date | 2024-10-01 |
| Proposed in-service date | 2028-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | RWE Solar Development, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.