TEXAS SOLAR NOVA 3 (22INR0215)

TEXAS SOLAR NOVA 3 is a 200.2 MW solar interconnection project in Kent, Texas with a current status of operational. It is proposed to connect at tap 345kV 11305 Dermott - 59904 Cottonwood.

200.2 MWCapacity
OperationalStatus
KentMarket
SolarTechnology

Project facts

Canonical nameTEXAS SOLAR NOVA 3
Queue ID22INR0215
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketKent
TechnologySolar
Capacity200.2 MW
StateTexas
CountyKent
Point of interconnectiontap 345kV 11305 Dermott - 59904 Cottonwood
Requested (queue) date2019-06-24
Proposed in-service date
Operational date2026-01-31
Withdrawn date
DeveloperTEXAS SOLAR NOVA 1, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata