Thelma 230kV (AC1-086)

Thelma 230kV is a 180.0 MW solar interconnection project in Northhampton, North Carolina with a current status of operational.

180.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameThelma 230kV
Queue IDAC1-086
Statusoperational
Source statusPartially in Service - Under Construction
Market
TechnologySolar
Capacity180.0 MW
StateNorth Carolina
CountyNorthhampton
Point of interconnection
Requested (queue) date2016-10-11
Proposed in-service date
Operational date2025-08-31
Withdrawn date
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata