Thirty First Street 115kV (AA1-115)

Thirty First Street 115kV is a 20.0 MW battery interconnection project in Blair, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameThirty First Street 115kV
Queue IDAA1-115
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StatePennsylvania
CountyBlair
Point of interconnection
Requested (queue) date2014-10-31
Proposed in-service date2016-06-01
Operational date
Withdrawn date2016-11-17
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.