Three Ranches BESS (29INR0170)

Three Ranches BESS is a 103.4 MW other interconnection project in Brewster, Texas with a current status of operational. It is proposed to connect at TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch.

103.4 MWCapacity
OperationalStatus
BrewsterMarket
OtherTechnology

Project facts

Canonical nameThree Ranches BESS
Queue ID29INR0170
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBrewster
TechnologyOther
Capacity103.4 MW
StateTexas
CountyBrewster
Point of interconnectionTAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch
Requested (queue) date2025-08-21
Proposed in-service date
Operational date2029-12-01
Withdrawn date
DeveloperThree Ranches Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata