Brewster County, Texas — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Brewster, Texas, representing 612 MW of requested capacity.
8Total projects
0Active
5Operational
2Withdrawn
612 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 3 | 269 MW |
| Solar | 4 | 269 MW |
| Battery | 1 | 73 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Three Ranches Solar | 28INR0271 | Solar | 125.5 MW | operational | Brewster, Texas |
| Three Ranches BESS | 29INR0170 | Other | 103.4 MW | operational | Brewster, Texas |
| Cone Mountain Batt | 21INR0516 | Other | 103.0 MW | withdrawn | Brewster, Texas |
| House Mountain | 66006_BA | Battery | 73.2 MW | operational | Brewster, Texas |
| House Mountain | 22INR0485 | Other | 63.0 MW | operational | Brewster, Texas |
| Bluebonnet Solar | 19INR0006 | Solar | 60.7 MW | withdrawn | Brewster, Texas |
| SolaireHolman Solar Project | 60989_PV1 | Solar | 50.0 MW | operational | Brewster, Texas |
| Hecate Solar | 16INR0099 | Solar | 33.0 MW | suspended | Brewster, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Three Ranches Energy LLC | 2 | 229 MW |
| One Energy Renewables | 1 | 61 MW |
| House Mountain | 1 | 63 MW |
| Hecate Energy | 1 | 33 MW |
| Ramsay Draw LLC | 1 | 103 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.